Installation and Operating Instructions
- Do not unpack the valve until installation to prevent falling of any unwanted substance that may affect the working of valve.
- Take measures against any possible damage that may occur during transport and shipment.
- Clean away every unwanted substance in your system before installation.
- Valve should be off position while installing.
- Be careful that the thread length of the part that will be installed to the valve will not be too longer or too shorter than the thread length of the valve.
- While installing, grab the valve by the appropriate tool from the across flats where you’ll install it.
- During installation do not use excessive adhesive or any unsuitable substance.
- Use the valve fully open or fully closed position.
- Do not paint the valve. Do not expose the valve with abbrasive chemicals.
- Do not use any other tools for opening or closing the valve and do not remove the handle.
- In case of any damage or disorder, valve should be changed by authorities.
- Complying with the installation and usage instruction is compulsory. Otherwise, the product will be out of guarantee.
- Do not forget to get the document of guarantee. This document is valid only with the related bill.