Get a Quote

Please enable JavaScript in your browser to complete this form.

Combined Air Separator

Technical Data Sheet

Product NameCombined Air Separator
Operating Temperature Max.110°C
Operating Pressure Max.10 bar
Intended UseCentral Heating Systems

Dimensions

Code80.60.710
D1 (thread)1/2″ (Female)
D2 (thread)1″ (Female)
L1146,5
H1140
H2120,5
H3113
Product Details
Documents

Technical Information Brochure

Download
Installation and Operating Instructions
  1. Do not unpack the valve until installation to prevent falling of any unwanted substance that may affect the working of valve.
  2. Take measures against any possible damage that may occur during transport and shipment.
  3. Clean away every unwanted substance in your system before installation.
  4. Valve should be off position while installing.
  5. Be careful that the thread length of the part that will be installed to the valve will not be too longer or too shorter than the thread length of the valve.
  6. While installing, grab the valve by the appropriate tool from the across flats where you’ll install it.
  7. During installation do not use excessive adhesive or any unsuitable substance.
  8. Use the valve fully open or fully closed position.
  9. Do not paint the valve. Do not expose the valve with abbrasive chemicals.
  10. Do not use any other tools for opening or closing the valve and do not remove the handle.
  11. In case of any damage or disorder , valve should be changed by authorities.
  12. Complying with the installation and usage instruction is compulsory. Otherwise, the product will be out of guarantee.
  13. Do not forget to get the document of guarantee. This document is valid only with the related bill.