Room Thermostat and Actuator Controlled Area Manually Controlled Area
Room Name Area (m2) Room Name Area (m2)
Room 1 Room 1
Room 2 Room 2
Room 3 Room 3
Room 4 Room 4
Room 5 Room 5
Room 6 Room 6
Room 7 Room 7
Room 8 Room 8
Room 9 Room 9
Room 10 Room 10
Room 11 Room 11
Room 12 Room 12
Room 13 Room 13
Room 14 Room 14
Room 15 Room 15
Total 0 m2 Total 0 m2
Pipe Range
The pipeline length for one zone is calculated to be 80m.

After entering the room values, you can see the calculations.