Get a Quote

Please enable JavaScript in your browser to complete this form.

17×2 Under Floor Union for Pipe Connection

Technical Data Sheet

Product NameUnder Floor Union for Pipe Connection
Intended UseInstallation Systems
Product Details
Dimensions
Code06.01.314
D1 (thread)1/2”
D2 (thread)M23X1,5
AA125
AA226
L116
L238,5
Material Properties
BodyBrass (CW617N)/(CW614N)
NutBrass (CW617N)/(CW614N)
RingBrass (CW617N)/(CW614N)
TipBrass (CW617N)/(CW614N)
Tip-OringNBR
Surface Properties
TipNickel
NutNickel
Technical Drawings
Documents

Technical Information Brochure

Download
Installation and Operating Instructions
  1. Do not unpack the valve until installation to prevent falling of any unwanted substance that may affect the working of valve.
  2. Take measures againts any possible damage thay may occur during transport and shipment.
  3. Clean away every unwanted substance in your system before installation.
  4. Valve sholud be off position while intalling.
  5. Be careful that the thread length of the part that will be installed to the valve will not be too longer or too shorter than the thread length of the valve.
  6. While installing, grab the valve by the appropriate tool from the across flats where you’ll install it.
  7. During installation do not use excessive adhesive or any unsuitable substance.
  8. Use the valve fully open or fully closed position.
  9. Do not paint the valve. Do not expose the valve with abbrasive chemicals.
  10. Do not use any other tools for opening or closing the valve and do not remove the handle.
  11. In case of any damage or disorder, valve should be changed by authorities.
  12. Complying with the installation and usage instruction is compulsory. Otherwise, the product will be cut of guarantee.
  13. Do not forget to get the document of guarantee. This document is valid only with the related bill.